TR

I-BEAM ATTACHMENT

I-BEAM ATTACHMENT

Meets NFPA®-13 requirements for seismic sway bracing

Step 1: Place the I Beam Attachment around the beam Step 2: Finger tighten nuts then bolts, next tighten all nuts and bolts until heads snap off. Step 3: Install Universal Structural Attachment for attaching to brace pipe.

Steel, electrogalvanised

           

            

Snap-off bolt head helps enable easy installation and inspection of seismic sway braces.